Muhammad Talha Khan, Full Stack Software Engineer. Creator of FileFlip (https://fileflip-gules.vercel.app/). This site needs JavaScript. Email Talhakhan050203@gmail.com or see the résumé at images/Talha-Khan-Resume.pdf.